Dyjasek Residential Demolition – Scope of Work: Our comprehensive demolition service includes a complete interior gut of the Dyjasek residence, featuring the removal of all flooring materials, plumbing fixtures and infrastructure, HVAC systems, and electrical components. We safely disconnect and remove all existing systems, ensuring compliance with local regulations and OSHA safety standards. After demolition, we perform thorough site cleanup and debris removal, leaving the property clean and ready for renovation or new construction.
Dyjasek Residential Demolition – Scope of Work: Our comprehensive demolition service includes a complete interior gut of the Dyjasek residence, featuring the removal of all flooring materials, plumbing fixtures and infrastructure, HVAC systems, and electrical components. We safely disconnect and remove all existing systems, ensuring compliance with local regulations and OSHA safety standards. After demolition, we perform thorough site cleanup and debris removal, leaving the property clean and ready for renovation or new construction.
Dyjasek Residential Demolition – Scope of Work: Our comprehensive demolition service includes a complete interior gut of the Dyjasek residence, featuring the removal of all flooring materials, plumbing fixtures and infrastructure, HVAC systems, and electrical components. We safely disconnect and remove all existing systems, ensuring compliance with local regulations and OSHA safety standards. After demolition, we perform thorough site cleanup and debris removal, leaving the property clean and ready for renovation or new construction.
Dyjasek Residential Demolition – Scope of Work: Our comprehensive demolition service includes a complete interior gut of the Dyjasek residence, featuring the removal of all flooring materials, plumbing fixtures and infrastructure, HVAC systems, and electrical components. We safely disconnect and remove all existing systems, ensuring compliance with local regulations and OSHA safety standards. After demolition, we perform thorough site cleanup and debris removal, leaving the property clean and ready for renovation or new construction.
Chevron RightChevron Right Icon
Chevron RightChevron Right Icon
Tim Hortons Nashville
Chevron LeftChevron Left Icon
Chevron LeftChevron Left Icon
Interior Demolition: Flooring: Remove all flooring finishes and adhesives completely. Plumbing Fixtures and Systems: Fully disconnect and remove plumbing fixtures, piping, and related components entirely. HVAC Systems: Remove all HVAC units, ductwork, thermostats, registers, and related equipment throughout the residence. Electrical Work: Completely remove electrical panels, wiring, conduit, switches, outlets, and lighting fixtures throughout. Walls and Ceilings: Remove walls and ceilings as required to access hidden mechanical systems or per renovation plan. Doors, Hardware, and Trim: Remove all interior doors, frames, trim, and associated hardware. Water Heater and Gas Lines: Completely disconnect and remove water heater and remove gas lines back to the meter.
Interior Demolition: Flooring: Remove all flooring finishes and adhesives completely. Plumbing Fixtures and Systems: Fully disconnect and remove plumbing fixtures, piping, and related components entirely. HVAC Systems: Remove all HVAC units, ductwork, thermostats, registers, and related equipment throughout the residence. Electrical Work: Completely remove electrical panels, wiring, conduit, switches, outlets, and lighting fixtures throughout. Walls and Ceilings: Remove walls and ceilings as required to access hidden mechanical systems or per renovation plan. Doors, Hardware, and Trim: Remove all interior doors, frames, trim, and associated hardware. Water Heater and Gas Lines: Completely disconnect and remove water heater and remove gas lines back to the meter.
Interior Demolition: Flooring: Remove all flooring finishes and adhesives completely. Plumbing Fixtures and Systems: Fully disconnect and remove plumbing fixtures, piping, and related components entirely. HVAC Systems: Remove all HVAC units, ductwork, thermostats, registers, and related equipment throughout the residence. Electrical Work: Completely remove electrical panels, wiring, conduit, switches, outlets, and lighting fixtures throughout. Walls and Ceilings: Remove walls and ceilings as required to access hidden mechanical systems or per renovation plan. Doors, Hardware, and Trim: Remove all interior doors, frames, trim, and associated hardware. Water Heater and Gas Lines: Completely disconnect and remove water heater and remove gas lines back to the meter.
Interior Demolition: Flooring: Remove all flooring finishes and adhesives completely. Plumbing Fixtures and Systems: Fully disconnect and remove plumbing fixtures, piping, and related components entirely. HVAC Systems: Remove all HVAC units, ductwork, thermostats, registers, and related equipment throughout the residence. Electrical Work: Completely remove electrical panels, wiring, conduit, switches, outlets, and lighting fixtures throughout. Walls and Ceilings: Remove walls and ceilings as required to access hidden mechanical systems or per renovation plan. Doors, Hardware, and Trim: Remove all interior doors, frames, trim, and associated hardware. Water Heater and Gas Lines: Completely disconnect and remove water heater and remove gas lines back to the meter.
Chevron RightChevron Right Icon
Chevron RightChevron Right Icon
Castle Dental Hendersonville
Chevron LeftChevron Left Icon
Chevron LeftChevron Left Icon
Detailed Scope of Work: Drywall Removal: Remove 940 linear feet of drywall at 24 inches above finished floor (A.F.F.). 6" Tile Base Removal: Remove 900 linear feet of 6" tile base. Salvage tile base as much as possible for potential reuse. Ceiling Tile Removal: Remove ceiling tiles as indicated on the provided plan. Ceiling grid system to remain intact. Cabinet Removal: Remove cabinets as marked on plans. Properly dispose of or recycle materials. Debris and Cleanup: Provide a 25-yard dumpster on-site for all demolition debris. Full cleanup of work area upon completion.
Detailed Scope of Work: Drywall Removal: Remove 940 linear feet of drywall at 24 inches above finished floor (A.F.F.). 6" Tile Base Removal: Remove 900 linear feet of 6" tile base. Salvage tile base as much as possible for potential reuse. Ceiling Tile Removal: Remove ceiling tiles as indicated on the provided plan. Ceiling grid system to remain intact. Cabinet Removal: Remove cabinets as marked on plans. Properly dispose of or recycle materials. Debris and Cleanup: Provide a 25-yard dumpster on-site for all demolition debris. Full cleanup of work area upon completion.
Detailed Scope of Work: Drywall Removal: Remove 940 linear feet of drywall at 24 inches above finished floor (A.F.F.). 6" Tile Base Removal: Remove 900 linear feet of 6" tile base. Salvage tile base as much as possible for potential reuse. Ceiling Tile Removal: Remove ceiling tiles as indicated on the provided plan. Ceiling grid system to remain intact. Cabinet Removal: Remove cabinets as marked on plans. Properly dispose of or recycle materials. Debris and Cleanup: Provide a 25-yard dumpster on-site for all demolition debris. Full cleanup of work area upon completion.
Detailed Scope of Work: Drywall Removal: Remove 940 linear feet of drywall at 24 inches above finished floor (A.F.F.). 6" Tile Base Removal: Remove 900 linear feet of 6" tile base. Salvage tile base as much as possible for potential reuse. Ceiling Tile Removal: Remove ceiling tiles as indicated on the provided plan. Ceiling grid system to remain intact. Cabinet Removal: Remove cabinets as marked on plans. Properly dispose of or recycle materials. Debris and Cleanup: Provide a 25-yard dumpster on-site for all demolition debris. Full cleanup of work area upon completion.